Nationwide Children’s Hospital
Location
Columbus, OH
Owner
Nationwide Children’s Hospital
Services
Sector
Healthcare
Type
Renovation, Addition
The Plan
We completed 36 projects for Nationwide Children’s Hospital since being our relationship in 1994. Projects vary from renovating offices, various medical suites, and procedure rooms to a chiller plant and off-campus clinics around Central Ohio. A majority of the projects were completed in the active hospital and occupied office suites.
Notable Projects:
- Print Shop – An existing 10,000 SF building was renovated into an in-house print shop, including roofing and insulation, storefront system, parking lot asphalt, loading dock, landscaping, new HVAC system, electrical wiring, interior partitions and finishes and exterior building coating.
- Children’s Drive Reconstruction – The demolition and reconstruction of 600 LF of Children’s Drive including new concrete curbs, bus stop, sidewalks, roller compacted concrete, asphalt, and pole lights.
- Conference Facility & Data Center – 87,204 SF conference space which features a data center.
- 255 E. Main St. Lower Level HVAC Renovations – Replacement of an entire HVAC system. Scope also included new ceilings, and lighting.
- J-West 4th Floor Remodel – 4,500 SF remodel consisting of open office workstations, private offices, copier area, breakroom, and workroom.
- Lobby & Restroom upgrades – Upgrades to finishes on the lower level, 2nd floor, and 3rd floor elevator lobbies in the AB building, and renovations to the restrooms on the 2nd & 3rd floors of the AB building.
- Sedation services – 32,000 SF interior renovation and improvements to the first floor; construction included an Interventional Radiology Suite, Clinical Sedation Suite, patient waiting area, registration area, and office support spaces.
- MRI #4 – Renovation to the north end of the active hospital included provisioning for a new three Tesla magnetic resonance imagers, electrical substations, and supporting renovation work.
- AB4 Eye & Rheumatology Expansion – A two-phased interior renovation (12,000 SF) of exam rooms, nurse stations and common spaces.